Of course, the costs of the factory, the design and the delivery are then amortised over the whole package. How Much Difference is There in Wall System Costs? Meanwhile, when one receives a price for a timber frame construction, the price is based on the whole structure and typically includes the intermediate flooring, the internal partition walling and the roof structure, with all of it being made away from site in a factory and then brought to site for erection. The blockwork prices above don’t account for any openings or the lintels and cavity closers that each of those requires. And that’s because of the ‘horse and cow’ syndrome. If you try to do the same thing with timber frame or SIPs, you’ll come unstuck.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |